Warning: Cannot modify header information - headers already sent by (output started at /usr/home/qxu1885190169/htdocs/core/start.php:1) in /usr/home/qxu1885190169/htdocs/core/init.php on line 17

Warning: Cannot modify header information - headers already sent by (output started at /usr/home/qxu1885190169/htdocs/core/start.php:1) in /usr/home/qxu1885190169/htdocs/core/init.php on line 18

Warning: Cannot modify header information - headers already sent by (output started at /usr/home/qxu1885190169/htdocs/core/start.php:1) in /usr/home/qxu1885190169/htdocs/core/init.php on line 19
NFJ-GNZmetal heavy load transformation floor-Beijing Jinke Composite Materials Co., Ltd.
Beijing Jinke Composite Materials Co., Ltd.

NFJ-GNZmetal heavy load transformation floor

Product Type:Heavy floor

Added time:2023-06-29

product description:NFJ-GNZ metal aggregate heavy load reconstruction ground is a product developed for the phenomenon that the ground in the mechanical processing industry is severely damaged and potholes can not meet the requirements of working conditions. Its

PHONE:400-969-2688

Application conditions:

· Places where electric epoxy flooring was originally used

· Places where steel plates and steel floor tiles were originally used as the ground

· Ground places with severe damage to the concrete surface
 

Advantages and characteristics

No equipment displacement during construction

· Simple process and short construction period.

·long lasting,                           

· No rust spots

· With anti-slip function


 

Note: The specific construction plan of this product requires the company's technical staff to conduct a site survey to develop a specific construction plan before construction.


XBeijing Jinke Composite Materials Co., Ltd.

截屏,微信识别二维码

手机:400-969-2688

邮箱:jkdp53@163.com

微信号已复制,请打开微信添加咨询详情!